Value Engineering can be applied to the Design/Build project delivery system at several stages. Each owner and design/build contractor can decide independently on the best opportunities.
For the Owner of a design/build project, the greatest opportunities for value improvement include:
 | | VE at the concept design stage |
 | | VE at the completion of preliminary design |
 | | VE of the Request for Proposal (RFP) documents |
 | | VE of the submitted proposals |
For the Design/Build Contractor, the greatest opportunities for value improvement include:
 | |
VE of the proposal demonstrating specific action to improve value on the project |
 | | VE of the project to develop Value Engineering Change Proposal opportunities, as permitted by the Owner |
LZA has applied Value Engineering in both of these situations, and can demonstrate the resulting benefits.